Next:
First Announcement of the
Up:
IRAM Newsletter 32 (July
Previous:
IRAM Newsletter 32 (July
Contents
First Announcement of the IRAM User Meeting on December 1st and 2nd, 1997 in Grenoble
30th Meeting of the IRAM Council: Antenna 6 for the PdBI
New Head of Administration
The LSA Study
30m Telescope
Summer transport schedule to Pico Veleta
IRAM T-Shirts soon available again
Improvements of the IRAM Spain computer network
Radio link between IRAM Granada and the Observatory
New Radio link between IRAM Granada and the University of Granada
Installation of a network switch at the Observatory
Installation of twisted pair cabling
Fast Ethernet
Network Monitoring
Programme Committee News
Call for Observing Proposals on the 30m Telescope
News
Reminders
Applications
Observing time estimates
Service observing
Programmes accepted for the May 1997 - Nov. 1997 period
Relevant Information about the 30 m Telescope
Receivers
3 mm SIS receivers
2 mm Receiver
1.3 mm Receivers
0.8 mm Receiver
Efficiencies, interferences, error beam
The MPIfR Bolometer array
Polarimeter
General point about receiver operations
Backends
Pointing / Focusing
Wobbler
References
Call for Observing Proposals on the Plateau de Bure Interferometer
Scientific results
J
=1-0 synthesis images of a dense torus in M 2-9
The mass and temperature distribution in the protoplanetary nebula M1-92:
interferometric observations
The molecular outflow and CO bullets in HH111
1.3 mm Plateau de Bure observations of IRC+10216
New Preprints
Postdoctoral Position Open
About this document ...
lucas@iram.fr