next up previous contents
Next: Scientific results Up: IRAM Newsletter 29 (November Previous: Interferometer

Program Committee News

30m-Telescope
A Programs B Programs C Programs
134.96 185.96 243.96 132.96 239.96 130.96 195.96 252.96
141.96 190.96 248.96 133.96 244.96 131.96 201.96 255.96
142.96 192.96 250.96 136.96 251.96 135.96 202.96 258.96
144.96 197.96 254.96 139.96 253.96 137.96 203.96 259.96
145.96 198.96 140.96 256.96 138.96 207.96
151.96 199.96 150.96 257.96 143.96 210.96
152.96 200.96 164.96 260.96 146.96 211.96
153.96 208.96 167.96 261.96 147.96 213.96
154.96 209.96 170.96 148.96 215.96
155.96 212.96 171.96 149.96 220.96
156.96 214.96 178.96 157.96 224.96
158.96 216.96 181.96 159.96 225.96
162.96 217.96 189.96 160.96 227.96
163.96 219.96 191.96 161.96 228.96
165.96 221.96 194.96 166.96 230.96
168.96 222.96 196.96 172.96 232.96
169.96 223.96 204.96 174.96 236.96
173.96 226.96 205.96 176.96 241.96
175.96 229.96 206.96 179.96 242.96
177.96 231.96 218.96 182.96 245.96
180.96 234.96 233.96 186.96 246.96
183.96 238.96 235.96 188.96 247.96
184.96 240.96 237.96 193.96 249.96

Notes: 262/263.96 are late proposals, deferred to the next session; 187.96 : Technical program.
We expect all A programs to be scheduled on the 30-m telescope although some with less time than originally requested. Only part of the B programs will be scheduled. This will take into account scientific merit, crowding in certain right ascension ranges and general aspects of balance.

Michel GUÉLIN

Interferometer
Project Rate Project Rate Project Rate Project Rate Project Rate
G003 B G007 B G020 C G023 B G031 C
G037 A G040 B G041 B G042 B G043 A
G044 C G045 A G046 B G047 C G048 A
G049 A G050 A G051 C G052 B G053 A
G054 A G055 B G056 A G057 B G058 A
G059 B G060 C G061 C G062 B G063 A
G064 A G065 B G066 C G067 A G068 C
G069 A G070 A G071 B G072 C G073 A
G074 A G075 B G078 B G079 A G080 A
G081 C G082 A G083 A G084 B G085 B
G086 C G087 C G088 C G089 B G090 C
G091 C G092 A G093 A G094 A G095 A
G096 C G097 B G098 A G099 A G100 C
G101 C G102 B G103 A

Project Status: A: Accepted, B: Backup if available time, C: Rejected.
The relatively large number of B proposals is related in part to our insufficient experience with the 5 antennas system, and also to the very significant number of long baseline projects.

Stéphane GUILLOTEAU


next up previous contents
Next: Scientific results Up: IRAM Newsletter 29 (November Previous: Interferometer

lucas@iram.fr