next up previous contents
Next: Scientific results Up: IRAM Newsletter 33 (October Previous: Data from Key Project

Programme Committee News

The IRAM PC met on October 13th to discuss the observing proposals submitted for the winter period (November 15, 1997 to May 15, 1998). The recommendations are summarized below:

30m-Telescope
Project Status A: Accepted, B: Backup if available time, C: Rejected.
Project Rate Project Rate Project Rate Project Rate Project Rate
101.97 C 102.97 C 103.97 C 104.97 C 105.97 A
106.97 A 107.97 C 109.97 A 110.97 C 111.97 C
112.97 C 113.97 C 114.97 C 115.97 A 116.97 C
117.97 B 118.97 B 119.97 B 120.97 C 121.97 C
122.97 A 123.97 B 124.97 C 125.97 A 126.97 C
127.97 C 128.97 A 129.97 A 130.97 B 132.97 A
133.97 A 134.97 A 135.97 C 136.97 A 137.97 A
138.97 C 139.97 B 140.97 C 141.97 B 142.97 A
143.97 B 144.97 B 145.97 B 146.97 A 147.97 A
148.97 B 149.97 A 150.97 A 151.97 C 152.97 C
153.97 C 154.97 A 155.97 B 156.97 C 157.97 A
158.97 B 159.97 A 160.97 B 161.97 A 162.97 A
163.97 C 164.97 C 165.97 C 166.97 C 167.97 A
168.97 A 169.97 B 170.97 B 171.97 B 172.97 A
174.97 C 175.97 A 176.97 C 177.97 C 178.97 A
179.97 B 180.97 B 181.97 A 182.97 A 183.97 A
184.97 A 185.97 A 186.97 A 187.97 A 188.97 A
189.97 C 190.97 A 191.97 C 192.97 A 193.97 A
194.97 C 195.97 A 196.97 B 197.97 B 198.97 B
199.97 A 200.97 C 201.97 C 202.97 C 203.97 A
204.97 B 205.97 C 206.97 C 207.97 C 208.97 A
209.97 A 210.97 C 211.97 C 212.97 B 213.97 A
214.97 B

Notes:

Michel GUÉLIN

Interferometer
Project Status A: Accepted, B: Backup if available time, C: Rejected.
Project Rate Project Rate Project Rate Project Rate Project Rate
H063 B H064 A H065 B H066 A H067 C
H068 C H069 C H070 C H071 B H072 A
H073 C H074 A H075 C H076 A H077 A
H078 B H079 A H080 A H081 A H082 C
H083 B H084 A H085 B H086 B H087 C
H088 A H089 A H090 C H091 A/B H092 C
H093 A H094 A H095 C H096 C H097 C
H098 B H099 A H100 A H101 A H102 C
H103 C H104 C H105 B H106 A H107 B
H108 B H109 C H110 A H111 A H112 A/B
H113 A H114 C H115 A H116 C H117 B
H118 A/B H119 A H120 A/B H121 B H122 C
H123 A H124 B H125 C H126 A/B H127 A/B
H128 B H129 B H130 B H131 C H132 A
H133 C H134 A H135 A H136 A H137 B
H138 A/B H139 B H140 B H141 C H142 A
H143 - H144 - H145 B H146 B H147 C
H148 C H149 B H150 C H151 C H152 C

Notes:

Stéphane GUILLOTEAU and Roberto NERI


next up previous contents
Next: Scientific results Up: IRAM Newsletter 33 (October Previous: Data from Key Project

lucas@iram.fr