Name | Stations |
5Dq | W08 E03 N07 N11 W05 |
6Cq | W12 E10 N17 N11 E04 W09 |
Part of the projects will be scheduled at the end of the summer period
when the six-element array is expected to be back to
operation. Projects that should be observed with a subset of the
five-element array, will be adjusted in uv-coverage and observing
time.
The following configuration sets are available:
Set | Main purpose |
D | Detection + ``low'' resolution mapping at 1.3mm |
CD | 3.5 resolution mapping at 3mm |