The IRAM program committee convened in Madrid on April 11 and 12 to
discuss the proposals submitted for the summer 2005 scheduling
period. The committee was chaired by Mario Tafalla (Observatorio de
Madrid). The principal investigators of each proposal have been
informed by letter which will include comments issued by the committee
about the outcome, if there are any.
A total of 54 proposals were received for the interferometer. The
programs were classified A (accepted), B (backup) and C
(rejected), as given in Tab. 1. Programs rated A will be scheduled in priority. Further
time, if it becomes available, will go to the B programs, taking into
account scientific merit, crowding in certain right ascension ranges
and general aspects of balance.
For projects rated A and B and without IRAM internal collaborator,
please consult the list of local contacts, which will be made
available shortly.
Table 1:
PdBI ratings: Summer 2005.
: some parts of the program, others rated B or C
A: Accepted, B: Backup, C: Rejected |
Project |
Rate |
Project |
Rate |
Project |
Rate |
P001 |
A |
P002 |
B |
P003 |
B |
P004 |
B |
P005 |
C |
P006 |
A |
P007 |
C |
P008 |
B |
P009 |
A |
P00A |
B |
P00B |
C |
P00C |
- |
P00D |
B |
P00E |
B |
P00F |
C |
P010 |
A |
P011 |
A |
P012 |
C |
P013 |
B |
P014 |
C |
P015 |
C |
P016 |
B |
P017 |
A |
P018 |
C |
P019 |
C |
P01A |
C |
P01B |
B |
P01C |
C |
P01D |
C |
P01E |
- |
P01F |
C |
P020 |
A |
P021 |
B |
P022 |
C |
P023 |
A |
P024 |
C |
P025 |
C |
P026 |
B |
P027 |
C |
P028 |
B |
P029 |
A |
P02A |
C |
P02B |
A |
P02C |
C |
P02D |
C |
P02E |
A |
P02F |
A |
P030 |
C |
P031 |
B |
P032 |
A |
P033 |
B |
P034 |
C |
P035 |
A |
P036 |
A |
|
104 proposals were received for the 30m telescope, requesting 4491.6
hours of telescope time. The highest rating ``A'' was given to 28
proposals; 51 proposals were rated ``B'', i.e. were given backup
status. The remaining proposals, although scientifically valuable in
most cases, were rated ``C''. The individual ratings are listed in Tab. 2. All A-rated proposals will be scheduled on the
telescope, although some with less time than requested. We expect that
about half of the B-rated programs will actually be scheduled. The
selection will take into account scientific merit, crowding in certain
right ascension ranges, and general aspects of balance. Proposals
rated ``C'' will not get telescope time.
The principal investigators of each proposal have been informed by
letter which will include comments issued by the committee if there
are any.
Table 2:
IRAM 30m proposal ratings: Summer 2005
A |
B |
C |
001-05 |
002-05 |
004-05 |
005-05 |
007-05 |
012-05 |
003-05 |
006-05 |
008-05 |
010-05 |
016-05 |
027-05 |
009-05 |
013-05 |
011-05 |
015-05 |
029-05 |
030-05 |
014-05 |
022-05 |
017-05 |
018-05 |
035-05 |
036-05 |
024-05 |
025-05 |
019-05 |
020-05 |
042-05 |
043-05 |
028-05 |
031-05 |
021-05 |
023-05 |
046-05 |
048-05 |
037-05 |
041-05 |
026-05 |
032-05 |
050-05 |
051-05 |
044-05 |
045-05 |
033-05 |
034-05 |
052-05 |
056-05 |
055-05 |
071-05 |
038-05 |
039-05 |
061-05 |
063-05 |
073-05 |
074-05 |
040-05 |
047-05 |
067-05 |
069-05 |
079-05 |
080-05 |
049-05 |
053-05 |
077-05 |
088-05 |
081-05 |
085-05 |
054-05 |
057-05 |
097-05 |
100-05 |
090-05 |
091-05 |
058-05 |
059-05 |
104-05 |
|
093-05 |
096-05 |
060-05 |
062-05 |
|
|
|
|
064-05 |
065-05 |
|
|
|
|
066-05 |
068-05 |
|
|
|
|
070-05 |
072-05 |
|
|
|
|
076-05 |
078-05 |
|
|
|
|
082-05 |
083-05 |
|
|
|
|
084-05 |
086-05 |
|
|
|
|
087-05 |
089-05 |
|
|
|
|
092-05 |
094-05 |
|
|
|
|
095-05 |
098-05 |
|
|
|
|
099-05 |
101-05 |
|
|
|
|
102-05 |
103-05 |
|
|
|
|
105-05 |
|
|
|
|
Accepted interferometer proposals which had requested time for
measurement of zero spacings will also get 30m time if they get
observed at Bure.
Roberto NERI and Clemens THUM