The IRAM program committee convened in Grenoble on October 10 and 11
to discuss the proposals submitted for the winter 2005/2006 scheduling
period. The committee was chaired by Mario Tafalla (Observatorio de
Madrid). The principal investigators of each proposal will be informed
by letter which will include comments issued by the committee if there
are any. As usual, the proposals were classified A (accepted), B
(backup), and C (rejected).
A total of 87 proposals were received for the interferometer
(Tab. 1), which represents a new record. Proposals rated
``A'' will be scheduled in priority. Further time, if it becomes
available, will go to the ``B'' programs, taking into account scientific
merit, crowding in certain right ascension ranges and general aspects
of balance.
For proposals rated ``A'' or ``B'' which do not have an IRAM internal
collaborator, please consult the list of local contacts:
(http://www.iram.fr/IRAMFR/PDB/loca.html)
Table 1:
Ratings of the Plateau de Bure
Interferometer proposals. A: Accepted, B: Backup, C: Rejected.
: some parts of the program - others rated B or C, : with
time restrictions.
Project |
Rate |
Project |
Rate |
Project |
Rate |
Project |
Rate |
Project |
Rate |
Project |
Rate |
P037 |
B |
P038 |
C |
P039 |
A |
P03A |
C |
P03B |
C |
P03C |
C |
P03D |
C |
P03E |
B |
P03F |
A |
P040 |
C |
P041 |
C |
P042 |
A |
P043 |
A |
P044 |
B |
P045 |
B |
P046 |
B |
P047 |
A |
P048 |
B |
P049 |
B |
P04A |
B |
P04B |
C |
P04C |
B |
P04D |
B |
P04E |
B |
P04F |
B |
P050 |
A |
P051 |
A |
P052 |
C |
P053 |
C |
P054 |
A |
P055 |
A |
P056 |
B |
P057 |
A |
P058 |
C |
P059 |
B |
P05A |
C |
P05B |
A |
P05C |
A |
P05D |
A |
P05E |
A |
P05F |
B |
P060 |
B |
P061 |
C |
P062 |
B |
P063 |
A |
P064 |
B |
P065 |
A |
P066 |
C |
P067 |
B |
P068 |
B |
P069 |
A |
P06A |
C |
P06B |
B |
P06C |
B |
P06D |
C |
P06E |
C |
P06F |
B |
P070 |
C |
P071 |
A |
P072 |
C |
P073 |
C |
P074 |
A |
P075 |
B |
P076 |
B |
P077 |
B |
P078 |
B |
P079 |
C |
P07A |
B |
P07B |
C |
P07C |
B |
P07D |
A |
P07E |
B |
P07F |
C |
P080 |
B |
P081 |
A |
P082 |
C |
P083 |
C |
P084 |
C |
P085 |
B |
P086 |
B |
P087 |
B |
P088 |
A |
P089 |
B |
P08A |
A |
P08B |
A |
P08C |
A |
P08D |
A |
|
|
|
|
|
|
|
132 proposals were received for the 30m telescope, requesting 4946.7
hours of telescope time. The highest rating ``A'' was given to 35
proposals ; 57 proposals were rated ``B'', i.e. were given backup
status. The remaining proposals, although scientifically valuable in
most cases, were rated ``C''. The individual ratings are listed in the
attached Tab. 2. All A-rated proposals will be scheduled on the
telescope, although some with less time than requested. We expect that
about half of the B-rated programs will actually be scheduled. The
selection will take into account scientific merit, crowding in certain
right ascension ranges, and general aspects of balance. Proposals
rated ``C'' will not get telescope time.
Accepted interferometer proposals which had requested time for the
measurement of zero spacings will also get 30m time if they get
observed at Bure.
Table 2:
IRAM 30m telescope proposal ratings fopr
the winter 2005/2006 session. A: Accepted, B: Backup, C: Rejected.
: parts of the proposal are rated lower or are subject to
special conditions.
A |
B |
C |
129-05 |
141-05 |
142-05 |
115-05 |
118-05 |
119-05 |
120-05 |
114-05 |
116-05 |
117-05 |
145-05 |
147-05 |
148-05 |
121-05 |
124-05 |
127-05 |
128-05 |
122-05 |
123-05 |
125-05 |
149-05 |
150-05 |
160-05 |
131-05 |
132-05 |
134-05 |
136-05 |
126-05 |
130-05 |
133-05 |
167-05 |
168-05 |
169-05 |
137-05 |
139-05 |
143-05 |
146-05 |
135-05 |
138-05 |
140-05 |
170-05 |
175-05 |
178-05 |
151-05 |
152-05 |
154-05 |
157-05 |
144-05 |
153-05 |
155-05 |
180-05 |
181-05 |
182-05 |
159-05 |
163-05 |
165-05 |
171-05 |
156-05 |
158-05 |
161-05 |
183-05 |
188-05 |
195-05 |
173-05 |
174-05 |
176-05 |
177-05 |
162-05 |
164-05 |
166-05 |
197-05 |
202-05 |
208-05 |
179-05 |
184-05 |
185-05 |
186-05 |
172-05 |
187-05 |
189-05 |
210-05 |
211-05 |
215-05 |
190-05 |
192-05 |
194-05 |
204-05 |
191-05 |
193-05 |
196-05 |
219-05 |
226-05 |
231-05 |
205-05 |
207-05 |
212-05 |
213-05 |
198-05 |
199-05 |
200-05 |
234-05 |
236-05 |
239-05 |
214-05 |
216-05 |
217-05 |
218-05 |
201-05 |
203-05 |
206-05 |
243-05 |
245-05 |
|
220-05 |
221-05 |
222-05 |
223-05 |
209-05 |
227-05 |
228-05 |
|
|
|
224-05 |
225-05 |
230-05 |
232-05 |
229-05 |
233-05 |
240-05 |
|
|
|
235-05 |
237-05 |
238-05 |
241-05 |
244-05 |
|
|
|
|
|
242-05 |
|
|
|
|
|
|
|
Roberto NERI and Clemens THUM